Two major developments have taken place since the last post: first, the old, patchy stucco has been chipped away, leaving a clean, even stone surface; second, doors and windows are being installed.
![]() |
The front of the house, i.e. the side that is visible from the road. The windows, left to right: upstairs, the master bedroom and its en-suite; downstairs, the kitchen, and Nancy's sewing room. |
![]() |
The western side, facing the courtyard. On the left, the three-panelled French door to the living room; just right of centre, the main door; and right, the dining room window. |
The same views, last year: